"The result is a truly comfortable atmosphere. We quickly realized that ofinto is completely reliable when it comes to this demanding schedule."
- Jonas Bumbacher, Project Manager for Expansion at the Teufen Group Clinic, on working with ofinto
From problem to solution: insights into a strategic partnership
The challenge
The Klinik Teufen Group faced a complex task: the opening of the new location in Altstetten (887 m²) not only had to adhere to a tight schedule and a defined budget, but also had to bring together various stakeholders.
The goal was much more than just furnishing: based on the project manual, the aim was to develop a design standard that could be replicated for all future locations. Away from the sterile clinic look, toward a feel-good atmosphere.
The process: From concept to reality
Instead of just supplying products, our interior designer acted as a strategic partner for rollout management:
- Analysis & Design: Detailed assessment of requirements and creation of a holistic room concept including 3D visualizations.
- Validation: On-site sampling in the ofinto showroom for final quality assurance of the materials.
- Implementation: Coordination of all logistics and assembly as a single point of contact—including just-in-time delivery for the opening.
The products: aesthetics in white & ergonomics
To stay within budget without compromising on quality, we chose an efficient combination:
- Workstations: Height-adjustable ofinto Rise tables (white/white) combined with Active chairs (white, including seat tilt function) for ergonomic working in 20 therapy rooms.
- Lighting & Acoustics: A holistic lighting concept featuring Lumino floor lamps and “Lumino ” desk lamps (accent color: blue), as well as acoustic partitions for privacy.
- Storage space: White, narrow office cabinets for space-saving organization.
The result
The Altstetten site was able to open on schedule with 349 pieces of furniture. Feedback from patients and employees confirms the "feel-good atmosphere." The clinic management now has a proven blueprint for further expansion.
Reliability, budget compliance, and design expertise are not optional in healthcare, but rather the basis for success.